178. DIRECTIVES TO THE ’ALGEMBA’ COMMISSION

(NOTED DOWN FROM MEMORY)[1]

First published in 1932 in Lenin Miscellany XX. Printed from the original. · page 157

28.V.1921

Check up with the utmost precision:

how much work exactly has been done (what part has been finished); 

how much material, rails, etc., foodstuffs, etc., has actually been transported to the spot; where they are; the conditions in which all these materials and the delivered •things are stored; the conditions and the concrete possibilities of returning all these materials, rails and all the rest, without losses, without stealing, or with minimum losses; the proportion of the possible and probable losses; 

it is the most important task to carry out this on-thespot assessment circumstantially and to verify it precisely.

With this problem solved, with the exact data in hand, a conclusion should be drawn up on the substance of the matter: is the “Algemba” construction to be stopped (if yes, how? by what date? etc.) or not to be stopped? and so on, and so forth.

V. Ulyanov (Lenin)
Chairman, C.L.D.